- Published: October 2020
- REF/ISBN: 9781787252172
- Edition: 1st
Overview:
Guidance on the testing, inspection and maintenance of pipeline emergency shutdown valves incorporating guidance regarding aspects common to non-closure-critical valves was commissioned by the Pipeline Users Group's (PLUG's) Good Operational Practice Forum (GOPF).
The purpose of this technical publication is to provide a basis for operating companies to ensure that any degradation, which could result in increased probability of failure, is detected and rectified before a major accident hazard (MAH) potential is reached.
This technical publication is focused on United Kingdom Continental Shelf (UKCS) requirements, and as such it refers to UK legislation and regulatory expectations.
Our publications website is designed exclusively for EI members and customers to easily access and download PDF versions of our publications. For hard copies, please contact the EI Publishing Team at pubs@energyinst.org. To access previously downloaded copies go to My publications.
-
User Type
-
PDF Document
-
Hard copy
-
25% discount on most EI publications
-
Free access to other EI publications
- Technical partners
- Free
- Contact us
- Technical company members
- Free
- Contact us
- Limited access
- EI member
- £90.00
- Contact us
- Non-member
- £120.00
- Contact us
Your membership
Technical partners
-
PDF Document
Free -
Hard copy
Contact us -
Free access to other EI publications
Your membership
Technical company members
-
PDF Document
Free -
Hard copy
Contact us -
Limited access to other EI publications
Your membership
EI member
-
PDF Document
£90.00 -
Hard copy
Contact us -
Limited access to other EI publications
Your membership
Non-member
-
PDF Document
£120.00 -
Hard copy
Contact us -
Limited access to other EI publications