3319 Technical workshop proceedings: Process safety management framework

process-safety
  • Published: March 2017
  • REF/ISBN: 9780852938140
  • Edition: 1st

Foreword

Technical workshop proceedings: process safety management framework provides a non-verbatim summary of the presentations and discussions from a technical workshop held on Thursday 7 July 2016.

The target participants were process safety specialists from the various energy industry sectors who have either implemented a process safety model, whether Energy Institute (EI) High level framework for process safety management (PSMF), or other, and have some experience to report, or were at a lower level of maturity such that they were considering implementing a process safety model. There were some 20 workshop participants.

Participants were by invitation only and were drawn from:

  • EI Process Safety Committee members (or colleagues).
  • EI Technical Partner companies via other EI committees.
  • EI Technical Company Members, EI member companies and EI individual members.
  • Various stakeholders (European Process Safety Centre and Tank Storage Association).

For delegates, the workshop helped by capturing issues, tips for implementations and experiences shared regarding use of the EI PSMF and Process safety management guidelines (PSMG). For the EI, the workshop set some direction on how to optimise the PSMF and PSMG in due course (e.g. by capturing what isn’t working in the framework/guidelines and how to improve it/them).

In conclusion, the need to revise the PSMF and PSMG was confirmed by the workshop participants, and the potential improvements were discussed.

The ultimate deliverables, should the recommendations in these proceedings be adopted, would be a revised PSMF and PSMG which will provide better guidance as to how companies can assure a high-level of process safety management (PSM).

The EI cannot accept any responsibility, of whatever kind, for damage or alleged damage arising or otherwise occurring in or about facilities to which this guidance has been applied. Suggested revisions are invited and should be submitted through the:

Technical Department
Energy Institute
61 New Cavendish Street
London
W1G 7AR.

1. Background

1.1  Introduction

In 2010, the EI published the PSMF, which defines what PSM should involve. Divided into four focus areas (process safety leadership, risk identification and assessment, risk management, and review and improvement) and sub-divided into 20 'elements', it sets out a framework of activities major accident hazard organisations should undertake to ensure PSM. Each element lists a number of high level activities organisations should meet (expectations).

EI PSMG is a series of 20 publications ('guidelines') that build on the PSMF. Commissioned by the EI Process Safety Committee (PSC) each guideline captures and presents current industry good practices and guidance on how organisations can meet the expectations set out in each element of the PSMF.

The PSM workshop was convened to enable reflection on the PSMF and PSMG, with a view to optimising the resources going forward.

Key topics discussed during this workshop included the following:

  • Tips for implementation in businesses (nature of the business: large vs. small, corporately vs. individual business units).
  • International application (use of PSMF and PSMG by international companies, use where there is limited local legislation, viability of transposing the framework to an international standard).
  • Using PSMG performance measures (PMs).
  • Any omissions in the framework and what should be added if revised.
  • Communicating the PSMF and PSMG to leaders through to workers.
  • Conflicting systems (integrating systems that are essentially all the same).

1.2 Documentation

  • High level framework for process safety management.
  • Guidance on meeting expectations of EI process safety management framework:
    • Element 1: Leadership, commitment and responsibility
    • Element 2: Identification and compliance with legislation and industry standards
    • Element 3: Employee selection, placement and competency, and health assurance
    • Element 4: Workforce involvement
    • Element 5: Communication with stakeholders
    • Element 6: Hazard identification and risk assessment
    • Element 7: Documentation, records and knowledge management
    • Element 8: Operating manuals and procedures
    • Element 9: Process and operational status monitoring, and handover
    • Element 10: Management of operational interfaces
    • Element 11: Standards and practices
    • Element 12: Management of change and project management
    • Element 13: Operational readiness and process start-up
    • Element 14: Emergency preparedness
    • Element 15: Inspection and maintenance
    • Element 16: Management of safety critical devices
    • Element 17: Work control, permit to work and task risk management
    • Element 18: Contractor and supplier, selection and management
    • Element 19: Incident reporting and investigation
    • Element 20: Audit, assurance, management review and intervention

1.3 Workshop agenda

The following agenda was issued for the workshop:

9:15 – 10.00
Registration/tea/coffee
10:00 – 10:15 Chairman’s opening remarks
− Review workshop objectives.
− Review 'house' arrangements/welcome.
− Reminder of EI anti-trust statement.
− Background and purpose of the workshop.
10:15 – 10:30 Introduction on the history of EI PSM (Delegates should be familiar with implementing the PSM Framework and PSM Guidelines.)
10:30 – 11:00 Presentation from Eni
11:00 – 11:15 Break
11:15 –11:45 Presentation from Woodside
11:45 – 12:15 Presentation from ENGIE
12:15 – 13:00 Lunch and networking
13:00 – 13:45 Discussion session – Continuous improvement of the framework and guidelines
− Framework.
− Guidelines.
− Suggested PMs.
13:45 – 14:15 Feedback on Session 1
14:15 – 14:30 Break
14:30 – 15:15 Session 2 – Learnings from implementation
− What has gone well?
− What could have gone better?
15:15 – 15:45 Feedback on Session 2
15:45 – 16:00 Closing remarks
− Wrap up.
− Feedback.
− Revisit objectives from start of day.
− Follow-up.
− Close.

2. Scene-setting presentations

2.1 Introduction on the history of EI PSM

John Pond, Chairman, independent consultant and ex-chairman of EI’s Process Safety Committee.

The programme for the day was opened with a definition of PSM; 'Managing the systems and procedures that prevent the uncontrolled release of energy'. PSM is vital to ensuring safe and continued operations in major accident hazard organisations. However, PSM is a multifaceted process, and a number of high profile incidents since 2005 have suggested that without a holistic understanding of the various factors required for effective PSM it can be difficult and inefficient to ensure, and measure performance.

EI has 'four steps' to go good process safety management:

  • EI PSMF;
  • EI PSM guidelines;
  • performance measures, and
  • EI Process Safety Survey (EIPSS).

EI PSMF was published in December 2010 and was downloaded more than 2 500 times in over 40 countries. It was adopted by UK Health & Safety Executive as their basis for assessment of PSM arrangements.

The set of 20 PSMGs were downloaded 5 100 times in over 55 countries.

There were three scene-settings presentations from operating companies namely Eni, Woodside and ENGIE. The presentation slides can be found in Annex B – Scene-setting presentations.

2.2 Application of high level PSMF to ageing assets

Mahmoud Gawish delivered a presentation on the application of high level PSMF to ageing assets for Eni’s business. Eni carried out a full assessment against the structured and comprehensive PSMF and associated PSMG. Most elements were adequate to Eni’s application and after reviews and discussions from key personnel, several elements were selected and tailored to the company’s needs.

It was suggested that the PSMF could be improved by:

  • adding a specific element regarding human factors issues;
  • incorporating more PSMF expectations from HSE’s KP4 asset life extension (ALE) programme for ageing assets;
  • considering value in inclusion of sub-element perhaps relating to onshore maintenance planning, backlog and deferral processes, and
  • avoiding duplication in some elements.

2.3 Building process safety management capacity

Gavin Ramsden (Woodside) provided an overview on building process safety management capacity at Woodside. The company went through a major project to clearly identify and improve its PSM systems. An assessment of external best practice was undertaken to provide project basis and the decision was made to use the EI PSMF on the following basis:

  • Peer company input.
  • Comprehensive and holistic.
  • Aligned with Woodside language.
  • Adopted by similar companies.

A workshop was held with multiple stakeholders to agree common principles, vision, scope of PSM and definitions.

EI PSMF was translated into corporate procedure and additional guidance was provided to identify how conformance can be demonstrated. Facilitated assessments of Woodside’s assets and functions helped identify gaps against the procedure. Engagement sessions provided the platform to launch the programme and its improvements. It was noted that all employees have a responsibility for process safety and how it applies will change depending on the role.

Four key areas of improvement were identified resulting in significant improvement date within Woodside:

  • Competency and capability.
  • Process safety risk assessment.
  • Integrity envelope and alarm management.
  • Safety critical element (SCE) management.

Implementation of the improvements enabled greater process safety performance.

2.4 Introduction to operational excellence

Graham Beale (ENGIE) provided an overview on process safety and operational excellence in the power industry. ENGIE has developed an operational excellence framework based on the EI PSMF. The generic framework has been re-written in 'power station language'. The framework contains 22 elements which are further split into 79 objectives. Each objective has an associated 'evidence statement'. The various stakeholders work through the objectives and, using the evidence statements, are rated from one to four. Minimum requirements are given a weighting factor of 2. The weighted score for each element are added up and averaged in a scoring spreadsheet which produces a spider diagram.

The operational excellence framework and the assessment process has been well received at all assets engaging in the process. The framework was updated in 2015 using two years of feedback and suggestions from power plants.

Other issues arising from scene-setting presentations include:

  • Potential for combining elements.
  • Define 'operations envelope'.
  • Define minimum requirements.
  • Link 'evidence' to element/expectation.
  • Is there a conflict with the definition of asset integrity and process safety?

The rest of the workshop was divided into two sessions where delegates discussed several topics.

Workshop session 1 – Continuous improvement of the framework and guidelines
The purpose of this session was for the breakout groups to review how to improve the framework and guidelines.

Workshop session 2 – Learnings from implementation
The purpose of this session was for the breakout groups to review learnings from Implementation.

3. Afternoon sessions

3.1 Session 1 – Continuous improvement of the framework and guidelines – What needs to be improved?

  • Framework
    • What should be added?
      • Commercial management.
      • HSE requirements (ALARP).
      • COSHH/DSEAR requirements.
      • Operational excellence.
      • Visibility of leadership/culture.
      • Human factors.
      • Environmental.
      • How PSM is interpreted.
      • Consider elements added by other businesses.
      • Inherent safety needs to be visible in the framework.
    • What should be removed?
      • No parts were suggested to be removed.
    • What should be modified?
      • Duplication in Element 7 and 8, and Element 10 and 18. It was suggested to maybe combine these elements.
      • Re-align focus areas.
    • Have you found alignment or conflict with other systems?
      • Difference between asset integrity and process safety.
      • Consider terminology: e.g. 'expectation' vs. 'requirements'.

A discussion started on the following elements:

  • Element specific discussions
  • Element 14 Emergency preparedness – Capturing worse case

It would be beneficial to look at worst case/low probability incident. It was noted that emergency response should be defined by risk assessment, using a risk matrix.

  • Element 15 Inspection and maintenance

It was noted that the title might be misleading. Consider integrity rather than inspection and maintenance.

  • Element 16 Management of safety critical devices (SCDs)
    • Defining SCD criteria.
    • Safety critical function e.g. safety critical control functions.
    • Basis for defining criticality on a register of SCDs.
    • Is it a function of the system?
    • Degree of criticality.
    • If not on register it is considered not critical?
    • Giving wrong direction in some cases.
    • Explicit reference to environmental issues e.g. safety and environmentally critical elements (SECE).
  • Guidelines

Despite the number of downloads, it was noted that there was a lack of awareness of the guidelines. Increased marketing would be beneficial to create awareness and clarify purpose. It was suggested that it would be beneficial to differentiate between minimum requirements and guidance.

It was noted that the guidelines could have different uses:

  • as review tool;
  • as audit too;
  • as reference, or
  • use in their entirety.

It was suggested to create a tool or guidance which would aid implementation of the guidelines.

  • Suggested PMs

It was agreed that the PMs were useful to measure 'process steps'.

It was noted that some PMs were identical across elements. This is purposeful and enables their aggregation up to board level reporting (see Element 20). In-line controls are for reality checks on site.

3.2 Session 2 – Learnings from implementation

  • What has gone well?
    • Integrated PSM into SSHE management system (not adding another system).
    • Customised EI PSMF into business management system (use of evidence statements).
    • Can be used to benchmark across businesses – share best practices.
    • Use of spider diagrams.
  • What could have gone better?
    • More helpful guidance on SCDs.
    • Lack of senior management support/sponsorship.
    • How to implement PSM in diverse businesses.
    • Better marketing of PSMF and PSMG.
    • Acknowledging that implementation depends on size of the business and available resource.
    • Recognising the difference in need for smaller independent vs. major organisations and in upstream vs. downstream oil and gas sectors.
  • What would you do differently to overcome these issues?
    • Drive from senior management/ sponsorship.
    • Start by getting support from CEO.
    • Detail the benefits for implementation.
    • Develop an awareness presentation which would promote the benefits of implementation.
    • Liaise with insurers.
    • Timeframes (resource, implementation).
    • Degree of bias.
    • Faster delivery of PSMG.
    • Promote where there is no local legislation.
    • Aim resources to regions with less mature legislation.
    • Develop a tool or guidance to aid implementation.

3.3 Summary of key workshop findings

Revision of PSMF and PSMG was proposed, and this could be covered by the following key issues:

  • Rationalise principles, e.g. process safety vs. asset integrity vs. operational excellence.
  • Combine some elements, e.g. inspection/maintenance and SCDs.
  • Revise some elements, e.g. define criticality of SCDs, consider SCD scope (e.g. refer to SECE), review stakeholder engagement vs. American Chemistry Council 'responsible care'.
  • Add some new elements, e.g. environmental management, having carefully defined its boundaries (from major accidents to the environment (MATTEs) through to operational environmental issues such as waste, energy and permits).
  • Define key terms such as 'operations envelope', 'minimum requirements', 'expectation' vs. 'requirements' (to align with ISO management systems standards).
  • Link 'evidence' to elements/expectations.

Participants also encouraged EI to develop tactics for successful implementation guidance.

The workshops findings, and the detail that builds on them, will be evaluated by PSC with a view to improve the PSM resources, e.g. by revising PSMF, and in due course, revising PSMG, and considering developing implementation guidance.

Annex A Glossary of acronyms and abbreviations

A.1 Glossary of acronyms and abbreviations

ALARP as low as reasonable practible
COSHH Control of Substances Hazardous to Health (Regulations)
DSEAR Dangerous Substances and Explosive Atmospheres Regulations
EI Energy Institute
HSE Health and Safety Executive
MATTE major accident to the environment
PM performance measure
PSM process safety management
PSMF High level framework for process safety management
PSMG process safety management guidelines
SCD safety critical device
SCE safety critical element
SECE safety and environmentally critical element

Annex B Presentations

B.1 Introduction on the history of EIPSM – John Pond

EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-11.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-12.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-13.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-14.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-15.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-16.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-17.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-18.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-19.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-20.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-0.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-1.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-2.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-3.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-4.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-5.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-6.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-7.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-8.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-9.JPG
EI-PSM-workshop-7th-July-2016_JP_Introduction-2MWB-Edit_last-version-Slide-10.JPG

B.3 Application of high level PSMF to ageing assets – Mahmoud Gawish

Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 01.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 02.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 03.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 04.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 05.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 06.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 07.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 08.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 09.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 10.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 11.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 12.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 13.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 14.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 15.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 16.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 17.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 18.jpg
Application of high level PSMF to ageing assets – Mahmoud Gawish Slide 19.jpg

B.3 Building Process Safety Management Capacity - Gavin Ramsden

B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-01.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-02.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-03.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-04.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-05.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-06.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-07.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-08.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-09.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-10.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-11.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-12.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-13.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-14.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-15.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-16.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-17.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-18.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-19.jpg
B.3-Building-Process-Safety-Management-Capacity-Gavin-Ramsden-Slide-20.jpg

B.4 Introduction to Operational Excellence - Graham Beale

B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-01.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-02.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-03.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-04.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-05.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-06.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-07.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-08.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-09.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-10.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-11.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-12.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-13.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-14.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-15.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-16.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-17.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-18.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-19.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-20.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-21.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-22.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-23.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-24.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-25.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-26.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-27.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-28.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-29.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-30.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-31.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-32.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-33.jpg
B.4-Introduction-to-Operational-Excellence-Graham-Beale-Slide-34.jpg

Acknowledgements

The workshop was commissioned by the EI Process Safety Committee and developed by a sub-group who prepared and facilitated the workshop:

Martin Ball Bossiney Consulting
John Briggs Kuwait Petroleum International
Mahmoud Gawish Eni
John Pond Independent consultant
Dr Mark Scanlon Energy Institute

The proceedings were prepared by Sam Daoudi (EI).

The Institute wishes to record its appreciation to the workshop participants:

Dr Ali Al-Zubaidi Consultant - Integrated Management Systems Associates (IMSA)
Lee Allford European Process Safety Centre
Graeme Beale ENGIE
Terry Cooper Total
Denise Costa Essar Oil
John Hart Greenergy
Jeff Hulance RWE
Chris Martin ENGIE
Gary Mowat Tullow Oil plc
Gavin Ramsden Woodside
Martin Ray RWE
Andrew Re Woodside
Barrie Salmon TSA
Stuart Sealey Certas Energy
Raman Sridhar BP Oil UK Limited.

Affiliations refer to the time of participation.

Our publications website is designed exclusively for EI members and customers to easily access and download PDF versions of our publications. For hard copies, please contact the EI Publishing Team at pubs@energyinst.org. To access previously downloaded copies go to My publications.

Membership icon Your membership
  • User type icon User Type
  • PDF icon PDF Document
  • Hard copy icon Hard copy
  • Discount icon 25% discount on most EI publications
  • Free icon Free access to other EI publications
Membership icon Your membership
  • Technical partners
  • Free
  • Contact us
Membership icon Your membership
  • Technical company members
  • Free
  • Contact us
  • Limited access
Membership icon Your membership
  • EI member
  • Free
  • Contact us
Membership icon Your membership
  • Non-member
  • Free
  • Contact us
Membership icon

Your membership

Technical partners

  • PDF icon PDF Document
    Free
  • Hard copy icon Hard copy
    Contact us
  • Free icon Free access to other EI publications
Membership icon

Your membership

Technical company members

  • PDF icon PDF Document
    Free
  • Hard copy icon Hard copy
    Contact us
  • Free icon Limited access to other EI publications
Membership icon

Your membership

EI member

  • PDF icon PDF Document
    Free
  • Hard copy icon Hard copy
    Contact us
  • Free icon Limited access to other EI publications
Membership icon

Your membership

Non-member

  • PDF icon PDF Document
    Free
  • Hard copy icon Hard copy
    Contact us
  • Free icon Limited access to other EI publications

Related EI content